The 500 ton placing a beam spanning the Flint River.
Click for larger view

Project:

Beach-Garland Road Bridge

Customer:

Hardman Construction Inc.

Location:

Flint, Michigan

Equipment:

Krupp KMK 8500

The 500 Ton Krupp was used to place thirteen 93 ft long, 77,000 lb. precast concrete beams using 115 ft. of luffing jib with a radius of 100 ft. The beams will support a new road spanning the Flint River in Flint Michigan.
Tree House Placement
Click for larger view

Project:

Tree House Placement

Customer:

Twin Pines Landscaping

Location:

Farmington Hills, Michigan

Equipment:

Grove KMK 5175

J.J. Curran Crane was contracted to lift three sections of a tree house over a residence and into the backyard. This very unique tree house was designed and constructed in California. The base was a 60" trunk of an oak tree. Onsite difficulties included the 155' radius, trees directly behind the pad, the 40' height of the house that was 10' from the pad, and there were no lifting eyes or lugs. Previous to JJ Curran, the homeowner contacted three different construction companies and their crane counterparts and all decline to do the job. The job required our 175 ton truck crane and the heaviest lift was 6000 lbs. It took 9 hours to complete the job. Working with the homeowners’ 4th contractor we designed a custom-made lifting beam that worked fantastic.
Wind Turbine Stock Photo
Click for larger view

Project:

Smokey Hills Wind Farm

Customer:

M.A. Mortenson Co.

Location:

Lincoln, Kansas

Equipment:

Link-Belt RTC80100

J.J. Curran’s 100 ton LinkBelt rough terrain crane was contracted to assist in the erection of the wind turbines on M.A. Mortenson’s Smokey Hills Wind Farm project that has the capacity to supply power to approximately 30,240 households annually.
Wind Turbine Stock Photo
Click for larger view

Project:

Camp Grove Wind Farm

Customer:

M.A. Mortenson Co.

Location:

Camp Grove, Illinois

Equipment:

Link-Belt RTC80100

J.J. Curran Crane assisted M.A. Mortenson Co. in the wind turbine erection of the Camp Grove Wind Farm in Camp Grove, IL. The 100 Ton LinkBelt rough terrain crane was the crane of choice for the project consisting of 100 turbines combining to produce enough energy to supply energy to approximately 45,000 households annually.
Wind Turbine Stock Photo
Click for larger view

Project:

Prince Wind Park

Customer:

M.A. Mortenson Co.

Location:

Sault Ste. Marie, Ontario

Equipment:

LinkBelt RTC80100

M.A. Mortenson Co. contracted J.J. Curran Crane to work in the Prince Wind Park, in Sault Ste. Marie, Ontario. A 100 Ton Link-Belt rough terrain crane assisted in the erection of wind turbines. The project consists of 126 GE Energy 1.5-megawatt wind turbines.